Project implementation support

Rehabilitation of Hydro Power Plants – Project Implementation Support (2011-ongoing) – project implementation and procurement support to Ukrhydroenergo in the framework of the EBRD financed program, review of the Ukrainian legal framework and applicable EBRD, World Bank and FIDIC procedures in the area of procurement of equipment and services, assistance in preparation of tender documents for several packages (project performed jointly with EDF Hydro Engineering Center).

Construction of 750 kV High Voltage Transmission Line Rivne NPP – PS Kyivska (2008-2010) – independent review of the project design documents and cost estimates, procurement and implementation support to NEC Ukrenergo in the framework of the EBRD-financed project (project performed jointly with CESI).

Construction of 330 kV High Voltage Transmission Line Adjalyk-Usatovo in Odesa Region (2005-2008) – independent review of the project design documents and cost estimates, procurement and implementation support to NEC Ukrenergo in the framework of the EBRD-financed project (project performed jointly with Sargent & Lundy).

Second Stage of the World Bank Funded Hydropower Rehabilitation and System Control Project (2007) – preparation of pre-qualification and tender documents, analysis of technical specifications.

Emergency Automation System for the Southern Grid of the IPS of Ukraine (2007) preparation of tender documentation for TSO under the EBRD financed project.

Rehabilitation and Modernization of 0.4–110 kV Grid of Krymenergo (2007)project initiation support,analysis of the project design documents, support in preparing documents and presentations for the EBRD, NERC and other Ukrainian state agencies.

Conversion of the High Voltage Transmission Line Rivne NPP – Zakhidnoukrainskaya Substation to the Voltage of 750 kV (2003) – preparation of the bidding documents and procurement support to TSO on the selection of general contractor.

Procurement of 6kV High Voltage Switchgear 6kV for Rehabilitation of Dniester Hydro Power Plant-2 (2003) project implementation and procurement support, preparation of tender documents and specifications.

Purchase of Electricity Metering Equipment for the Wholesale Electricity Market (2002) – development of the tender documentation and technical specifications.

World Bank Rehabilitation of Hydropower and System Control Project (2002) – preparation of the sections for the Final Evaluation Completion Report.